Reactor System
Expanded Poly-Styrene

In November 2007, Texol commissioned the project for the EPS Pilot Reactor awarded by L G Polymer India Pvt. Ltd, Vishakhapatnam. This plant consists of a 200 Lit SS Polymerization Batch reactor with paraphernalia around the reactor. Plant has 1/4” tubing as well as piping up to 1” size. This is a scaled down version of the existing commercial scale reactor and meant for study of various grades of EPS.